Primary Secondary Long Signal Short signal
|
The Delineator Primary December 11, 2008-February 4, 2009
The number shown in white is the total change that occurred in SPY from the point of a slope change (up or down) to near the extreme of that move and prior to the next slope change.
SCROLL RIGHT AND LEFT TO VIEW CHART. |

vi 2